New construction and renovation services are being provided at the Hamilton Bus Maintenance Facility for Metropolitan Atlanta Rapid Transit Authority (MARTA). Renovation work includes the renovation of the interior and exterior of the existing Administration/Maintenance and HVAC Buildings. The work includes known or suspect environmental impacts to specific subsurface areas, with the potential environmental impacts to unknown areas of the facilities where specific waste handling methods are required. Construction, also includes the addition of one new canopy for the non-revenue fueling station.
New construction at the maintenance facility consists of six new buildings that include:
❖ Fuel Service Building
❖ Fare Retrieval Building
❖ Bus Wash & Tire Building
❖ Bus Clean Building
❖ CNG Compressor Station
❖ Industrial Wastewater Treatment Plan
SKYLINE performed subsurface utility design and coordination for 10” diam. domestic water, 8” diam. industrial waste, and 8” diam. sanitary sewer lines. Industrial Wastewater Treatment Plant (IWTP) Building design services includes a concrete foundation, a retaining wall, a pre-fabricated metal building, metal stairs and handrails, storage tanks, and equipment for treating industrial waste water. Services provided are part of a five-year contract for MARTA.